Completed on May 23, 2026, this Vancouver roof and gutter replacement covered 3,750 sq ft across the house and garage. We used IKO Dynasty shingles in Glacier on the pitched sections and replaced the flat roofing.

Vancouver Roof and Gutter Replacement with IKO Dynasty Glacier
Location
Vancouver, BC
Surface Area
3,750 sq ft (house and garage)
Services
Roof Replacement & Repairs

On this Vancouver home, moss had settled between the old asphalt shingles and beside the skylight. At the eaves, the shingle edges had started to curl above a gutter that held water and debris. We replaced the pitched roofing, the flat roof sections and the gutters, completing the project on May 23, 2026. The house and garage had a combined roof area of 3,750 sq ft.

Curled shingle edges beside standing water in the old gutter.
Before the tear-off, several shingle edges had curled up above the old gutter.
Moss along the old shingles beside a skylight on the Vancouver home.
The original shingles and moss beside the skylight.

From the plywood deck to Glacier shingles

We removed the old shingles to expose the plywood deck, then laid synthetic underlayment across the pitched roof. We installed IKO Dynasty shingles in Glacier, working up from the eaves. The mix of grey tones is especially visible on the lower roof beside the home’s green siding.

Plywood deck exposed on a lower roof section after shingle removal.
The plywood deck was exposed after the old shingles came off this roof section.
Blue synthetic underlayment above the first courses of new shingles.
With the synthetic underlayment in place, the first shingle courses went on at the eaves.
Grey IKO Dynasty Glacier shingles along the lower roof beside green siding.
A closer look at the Glacier colour on the lower roof beside the green siding.

Flat roof sections and gutters

The roof changes from shingles to a flat surface at the top of the house. Our crew installed new flat roofing on those sections. The close-up shows the metal flashing along the edge where the flat roofing meets the shingles below. We also replaced the old gutters along the eaves.

A roofer fitting material where a flat roof section meets a shingled slope.
A crew member fits the flat roofing at the transition to the shingled slope.
Granulated flat roof surface and grey metal flashing above the new shingles.
The finished flat section, with metal flashing along the edge above the shingles.

The finished roof

From above, you can see how the Glacier shingles run across the main roof and the lower eaves. The lighter trim and gutters follow the roofline against the green siding.

Overhead view of the finished grey shingle roof, skylight and lower eaves on the green Vancouver home.
The completed house roof, seen from above after the May 2026 roof and gutter replacement.
Request your free estimate

Share your contact details and property location. We’ll get back to you within 24–48 hours to discuss your project and the next step. No obligation.

Thank you

Thanks for submitting!
We will reach you in the next 24-48 hours
Oops! Something went wrong while submitting the form.

Let’s plan your roofing or exterior project.